The art of documentation

By Michael Deren

Surprisingly, it’s not uncommon for machinists to feel like they’re starting at square one when setting up and running a repeat job. The primary reason is lack of documentation.

When a new job arrives, I first create a bill of operations, or process sheet. A BOO provides a road map for how to process a given part. The more complex the part, the more detailed the BOO should be. Some like to keep it short and sweet, but I prefer to be as descriptive as possible to reduce or eliminate the number of questions that come up later on.

Note that the BOO shown here includes the operation number, machine number, work description, setup time and part run time. This enables you to access process information with a quick glance.

This BOO is for a simple tubular part, which is first cut to length on a bandsaw. Then it’s turned on a lathe before being welded. After welding, the workpiece returns to the lathe for finish turning, goes to a vertical machining center for holemaking and heads back to the welding department to weld on a boss. Bead blasting is the final operation.

Bill of operations for a simple tubular part.

Operation

Machine number

Description

Setup (hours)

Run time (hours)

5

Pull parts

0.0000

0.0001

10

97

Bandsaw

0.0500

0.0600

20

83

83 TC

Turn body and rough ID

0.2500

0.1500

25

83

83 TC

Machine flanges

0.2300

0.1860

30

48

Misc. welding

Weld flanges to body

0.0830

0.3333

40

83

83 TC

Finish machine body and flanges

0.2500

0.1000

50

51

51 VMC

Machine coil hole

0.1500

0.0666

60

48

Misc. welding

Weld boss

0.0300

0.1000

70

95

95 BB

Bead blast and wash

0.0200

0.0500

Additional information on a BOO can prove helpful. For example, if the welds must be aesthetically pleasing, include an image of a good weld. A more complicated part typically includes a drawing with dimensions.

But what about the fixture and how to mount the part onto the fixture? Many shops fail to correctly document this on a BOO. I give the guys in the shop a drawing that shows the fixture and workpiece and provides the X, Y and Z coordinates from the tram hole on the fixture to the X and Y zero reference points of the part for all sides that require machining. I also provide images of the part loaded onto the fixture. If there is something I need to provide detail on, I document it with a close-up shot. Spending extra time up front to show the little things can save a lot of operating time down the line.

Relying on your memory can be effective for many activities, but not job setup. I can remember saying, “This setup is a piece of cake; it’s burned into my brain!” Then, the job repeats 6 weeks later and I have forgotten what fixture and tools I used. By documenting everything you do, you can probably reduce setup time 50 percent the next time that job comes around.

Sometimes, you just can’t document everything the first time because time runs out or you’re not there when the part is run, but document as much as you can. The next time that job comes in, document more of it. By the third go-round, your documentation should be up to snuff. When that job repeats, you’ll feel confident that the job packet you hand the machinist has everything he needs to run the job successfully. CTE

About the Author: Mike Deren is a manufacturing engineer/project manager and a regular CTE contributor. He can be e-mailed at mderen1@wi.rr.com.